Alfama · Chiado · Príncipe Real

Find a trusted renovation contractor
in Lisbon

From pombaline apartments in Alfama to modern flats in Parque das Nações, we connect you with vetted, English-speaking renovation contractors who know Lisbon's building stock.

✓All contractors verified✓Feedback-based ranking✓English-speaking network✓Free matching for homeowners

Free to use · No obligation · We respond within 24 hours

What's your project?

Lisbon mainstream pricing; heritage zones run 15 to 25% higher

Kitchen remodel
From €8,000
Same layout, new cabinets and worktops
Bathroom renovation
From €12,000
New suite, tiling, plumbing
Full renovation
From €850/m²
Complete apartment or house
Something else
From Free to ask
Repairs, flooring, structural work

Prefer to skip the form? Message us on WhatsApp and tell us what you need.

Areas we cover

Lisbon changes parish by parish

Pricing shifts sharply by neighbourhood, driven mostly by building age, lift access, and heritage status. Here's roughly how each area compares to the mainstream baseline.

Príncipe Real / Chiado

+15 to 25%

Heritage buildings, no lifts, narrow stairs.

Alfama / Lapa

+15 to 20%

Period properties, difficult access.

Belém / Restelo

+5 to 10%

Upscale riverside stock, embassies nearby, larger properties.

Estrela / Campo de Ourique

Baseline

Mixed stock, reasonable access, mainstream pricing.

Avenidas Novas / Saldanha

-5 to 10%

1940s to 70s buildings with lifts, simpler layouts.

Parque das Nações / Marvila

-8 to 12%

Newer buildings, fewer surprises.


Why Lisbon is different

What changes when you cross from one Lisbon parish to the next

01

Heritage buildings dominate the centre

Pombaline and gaioleiro-era buildings need specialists comfortable with lime mortar, timber floors, and party walls shared with neighbours.

02

Câmara Municipal de Lisboa

Lisbon's câmara is slower than most; licenciamento for structural work often runs toward the long end of 20 to 45 days, and ARU heritage zones can add months more.

03

No two buildings are alike

Many central buildings lack lifts and have narrow stairwells, which affects everything from skip placement to appliance delivery.

04

Highest contractor demand in the country

Lisbon has the largest pool of contractors, but also the most competition for foreign-owner projects, so vetting quality matters even more here.


Real numbers

Lisbon vs. the Lisbon baseline

Lisbon (mainstream areas)
€850/m²
Mid-range finish, full renovation, no structural surprises.
Heritage core (Príncipe Real, Alfama, Chiado)
€980–€1,200+/m²
Same finish level. Lime mortar, timber restoration and no-lift access push the top end higher.

Compare before you choose

remodel vs. finding someone yourself

The practical differences that matter when you're renovating from a distance, or in a language you don't speak yet.

CriterionremodelFacebook groups & referrals
Licence & insuranceVetted and verified before joiningRarely checked
English communicationEnglish-speaking options available on requestDown to luck
Response timeReplies within 24h, or they're removed from the networkCan go quiet for weeks
PricingItemised quotes, checked against Lisbon-area mediansVerbal, "trust me" estimates
Heritage-building experienceChecked before you are matchedOften unverified
If it doesn't work outWe help you remedy the situation and find a replacementNo recourse; deposits already paid are often lost

Honest answers

Lisbon renovation questions

How much does a full renovation cost in Lisbon?

Mainstream Lisbon neighbourhoods run around €850/m² for a mid-range full renovation. Heritage-zone properties in Príncipe Real, Alfama or Chiado typically run €980 to €1,200+/m² due to lime mortar, timber restoration, and no-lift access.

How long do renovation permits take in Lisbon?

Licenciamento from the Câmara Municipal de Lisboa typically takes 20 to 45 days for structural work, often toward the longer end. Properties in Área de Reabilitação Urbana (ARU) heritage zones can add several months.

Do you cover Alfama, Chiado and Parque das Nações too?

Yes. Our Lisbon network covers Príncipe Real, Chiado, Alfama, Lapa, Estrela, Campo de Ourique, Avenidas Novas, Saldanha, Belém, and Parque das Nações.

Is this really free for homeowners?

Contractor matching is free: there is no cost to submit a request, get matched or receive a quote, and the contractor pays us a success fee on completed projects. Project management is a separate service, with its price agreed with you before any work starts and included in the overall quote on managed projects.

Do contractors really speak English?

Yes. Our network includes both English and Portuguese speaking contractors, and English-speaking options are available on request, so you can discuss scope, materials, and timelines without a language barrier.

What legal and financial checks do you run?

Every contractor is vetted and verified by remodel before joining the network. We check their track record and references, their tax and social security standing, and their civil liability insurance with proof of coverage limits, and we confirm the company is not in insolvency or carrying significant registered debt. Where the work legally requires a construction licence (alvará), we confirm it.


By trade

Looking for a specific trade in Lisbon?


Nearby areas

We also cover these areas nearby

Are you a contractor in Portugal?

Join our curated network and get matched with international clients who are ready to renovate.

Apply to join

Useful guides

Cost data, permit guides, and the renovation passport for owners renovating in Lisbon and the surrounding area.