Electricians · Lisbon

Find a trusted electrician in Lisbon

Older apartments often need a panel upgrade before air conditioning or a modern kitchen goes in, and pombaline buildings need cable routing planned around original timber structure. remodel.pt matches you with an alvará-verified electrician who already works this area, and checks the quote against Lisbon-area medians before you see it.

Tell Us About Your Project

What an electrician covers here

The scope of the trade in Lisbon

01

Full and partial rewiring

Replacing degraded wiring in older central Lisbon apartments, common ahead of a kitchen renovation or air conditioning installation.

02

Panel and circuit upgrades

Legacy 6.9kVA panels were rarely sized for today’s appliance load. Upgrading capacity is often the first step before any other electrical work proceeds.

03

Working around original building structure

Pombaline and gaioleiro buildings have timber-framed elements that shape where cable routing can run, different from a modern concrete-frame apartment.

04

RTIEBT-compliant installation

Circuits properly separated and certified to the current Portuguese technical regulation, required for insurance and resale.

05

Compliance and safety certification

Bringing older installations up to current code, and issuing the certification needed for insurance or resale.

06

Smart home and automation wiring

Pre-wiring for lighting control and security systems during a renovation is far cheaper than retrofitting cabling into finished pombaline or gaioleiro walls afterward.

Read the full electrical rewiring cost guide →

Typical costs

What electrical work costs in Lisbon

Heritage buildings in Alfama, Baixa, or Chiado with original structure to work around tend toward the higher end; apartments in Avenidas Novas or Campo de Ourique sit closer to baseline.

JobTypical cost
Day rate€160–€270
Circuit or socket addition€100–€240
Panel upgrade€800–€1,750
EV charger installation€850–€2,000
Full rewire, apartmentfrom €5,000

Common mistakes

What goes wrong when hiring an electrician in Lisbon

Skipping the panel capacity check

Adding air conditioning or a modern kitchen without first confirming the panel can handle the load is one of the most common call-backs on Lisbon apartment renovations.

Assuming cable routing works like a modern building

Pombaline and gaioleiro structure often forces cable runs around original timber framing rather than straight through walls, which changes both cost and timeline if not planned upfront.

Not checking condomínio rules for shared systems

Work affecting a building's shared electrical supply or meter room can need condomínio sign-off in addition to standard câmara requirements.

Accepting a verbal-only quote

Scope, materials, and certification should be written down before work starts, especially for a full rewire.

No safety certificate on completion

A credible electrician issues an RTIEBT compliance certificate for the completed work. Ask for it upfront, not after the fact.

Not planning cable routes for future additions

Skipping conduit or spare cabling for smart-home additions during a renovation means costly retrofitting later, especially difficult once original wall structure is finished over.

How we vet

Every electrician meets the same standard

✓

Alvará de construção, valid construction licence, subcategoria 4, checked against the IMPIC registry before any contractor joins the network.

✓

Civil liability insurance, active policy confirmed, with coverage limits noted on file.

✓

Heritage-building experience, checked before you are matched, since working around original pombaline or gaioleiro structure is not a universal skill.

✓

Working English, confirmed before joining, enough to discuss scope, materials, and changes without confusion.

Questions about hiring an electrician in Lisbon

Need an electrician in Lisbon you can trust?

Tell us about your project and we'll match you with a trusted professional in the Lisbon area, alvará-verified, insured, and ready to quote.

Tell Us About Your Project

See all trades and pricing for the Lisbon area →