Bathroom rebuild · Last updated July 2026

Bathroom rebuild in Portugal

A bathroom rebuild in Portugal runs €12,000 to €38,000 and typically takes 4 to 8 weeks. Keeping the existing layout keeps costs at the lower end, moving the toilet or shower adds €3,000 to €8,000 for drain rerouting. remodel matches you with a vetted and verified contractor experienced in wet-room waterproofing, and checks the itemised quote against regional project data before you see it.

Finished bathroom with walk-in shower and stone tile

€12,000–€38,000 · 4–8 weeks

What's included

01

Waterproofing and tiling

Full wet-area waterproofing (impermeabilização) tested before tiling starts, then floor and wall tiling to your chosen material and pattern.

02

Sanitaryware and fixtures

Toilet, basin, shower or bathtub, and taps, installed to current layout or relocated, with plumbing rerouted and tested accordingly.

03

Electrical and ventilation

Lighting, heated towel rail, and extractor fan wired to a wet-area-safe circuit, essential in older Portuguese buildings.

04

Quote benchmarking

Your itemised quote is checked against remodel regional project data before it reaches you, so layout changes and material choices are priced transparently.

Read the full cost and timeline breakdown →

Regional pricing

How location moves the price

AreaWhyVs. baseline
Cascais / EstorilCoastal demand, highest foreign-owner density+10 to 20%
Lisboa (central)Heritage buildings, narrow access, higher labour rates+15 to 25%
SintraMixed heritage and suburban stockBaseline to +10%
Porto / inland municipalitiesLower labour rates, easier site access-10 to 15%

What we verify

Every bathroom contractor meets the same standard

✓

Vetted and verified, Every contractor is vetted and verified by remodel before joining the network. Where the work legally requires a construction licence (alvará), we confirm it.

✓

Insurance in writing, proof of liability insurance requested before work starts.

✓

English on request, English-speaking options are available on request, enough to discuss scope, materials, and changes without confusion.

✓

Waterproofing track record, prior bathroom rebuild projects checked, waterproofing failure is the single biggest quality risk on this category.

Questions about bathroom rebuilds

Planning a bathroom rebuild?

Tell us the room, rough dimensions, and whether the layout changes, and we'll match you with a vetted, English-speaking contractor for a competitive itemised quote.

Request a Quote

Before you sign: contractor due diligence checklist (PDF)