Kitchen renovation contractors · Portugal
Find a trusted kitchen renovation contractor in Portugal
A kitchen renovation touches electrical, plumbing, and carpentry at once, and older Portuguese buildings often need an electrical upgrade before a modern appliance set will even run. remodel matches you with a contractor who coordinates it as one project, and checks the quote against regional project data before you see it.
Tell Us About Your ProjectRenovating in Cascais? See coastal-specific pricing and considerations →
Renovating in Lisbon? See Lisbon-specific pricing and considerations →

What a kitchen contractor covers
The scope of the trade
Full kitchen renovation
Coordinating demolition, plumbing, electrical, cabinetry, and finishes as a single project.
Cabinetry and worktops
Installing new cabinets and worktops, from flat-pack systems to fully custom carpentry.
Electrical upgrades for appliances
Sizing the electrical supply correctly for induction hobs, ovens, and dishwashers, a common gap in older buildings.
Plumbing for sink and appliances
Supply and waste lines for the sink, dishwasher, and any relocated fixtures.
Layout changes
Moving the kitchen’s footprint within a property, which touches plumbing, electrical, and sometimes structural work.
Typical costs
What a kitchen renovation costs in Portugal
| Scope | Typical cost |
|---|---|
| Cosmetic, same layout | €8,000–€12,000 |
| Mid-range full replacement | €12,000–€18,000 |
| Premium, layout change | €18,000–€30,000+ |
| Electrical panel upgrade | +€800–€1,500 |
Common mistakes
What goes wrong when hiring a kitchen contractor
Underestimating electrical capacity
A kitchen with induction hob, oven, and dishwasher running together needs more supply than most older Portuguese apartments have. Confirm the kVA before ordering appliances.
Not accounting for permits on layout changes
Moving the sink or altering the electrical layout can require a Comunicação Prévia. Confirm this before demolition, not after.
Cheap cabinet carcasses
A flat-pack cabinet structure paired with custom fronts from a local carpenter is a common, cost-effective combination. A fully cheap carcass shortens the kitchen’s lifespan.
No design plan before ordering
Ordering cabinets before finalising appliance placement and plumbing points leads to expensive on-site adjustments.
Poor trade sequencing
Cabinetry installed before electrical and plumbing rough-in is finished causes rework. A single coordinating contractor prevents this.
How we vet
Every kitchen contractor meets the same standard
Vetted and verified, Every contractor is vetted and verified by remodel before joining the network. Where the work legally requires a construction licence (alvará), we confirm it.
Insurance in writing, proof of liability insurance requested before work starts.
Multi-trade coordination, a track record managing plumbing, electrical, and carpentry as one sequenced project.
English on request, English-speaking options are available on request, enough to discuss layout, materials, and appliance specs without confusion.
Questions about hiring a kitchen contractor
Need a kitchen contractor you can trust?
Tell us about your project and we'll match you with a trusted professional, vetted and verified, and ready to quote.
Tell Us About Your Project