Contractor Vetting

Every contractor on remodel is verified before they see your project.

Contractor vetted and verified. Insurance confirmed. References called. English capability assessed. No contractor quotes on your renovation until all four pass.

The problem

Portugal has no public contractor rating system.

In the UK, you check Trustpilot. In the Netherlands, Bouwgarant. In Portugal, the construction market is opaque by design. Foreign owners rely on Facebook group recommendations, unverified Google reviews, or whoever the estate agent suggests. There is no standardised way to verify whether a contractor is licensed, insured, or has finished a project on time.

remodel exists because that gap costs foreign property owners money, time, and trust. We built a verification layer that contractors must clear before they see a single project brief.

Verification requirements

How we vet and verify.

Licensing where it applies (alvará)

Where the work legally requires an alvará, we check it against IMPIC records, including its class and category. Many experienced contractors, including foreign-run firms, work without one on smaller scopes. We judge those on references, finished work and how they treat clients instead.

Insurance in writing (seguro de responsabilidade civil)

We ask for proof of liability insurance before work starts, so property damage, third-party claims and worker injury are covered during the renovation.

Verifiable project references

A minimum of completed projects with verifiable owner references. We contact previous clients directly and review photographic evidence of finished work.

English-speaking options

Our network includes both English and Portuguese speaking contractors. English-speaking contractors are available on request, with quotes, timelines and updates in English.

What is IMPIC

The regulator behind every alvará.

IMPIC (Instituto dos Mercados Públicos, do Imobiliário e da Construção) is the Portuguese public authority that regulates the construction market.

Every construction company operating in Portugal must hold an alvará issued and renewed by IMPIC.

An alvará is classified by category (type of work) and class (project value threshold). where a licence applies, remodel verifies the contractor's class covers the value of your project.

IMPIC maintains a public registry. Where a licence applies, we cross-reference the contractor's claims against this registry.

What a verified profile looks like

Real credentials. Not a logo wall.

Construções Almeida & Filhos, Lda.

General Construction · Interior Renovation

Vetted and verified

Region

Cascais · Sintra · Lisboa

Experience

18 years

Languages

PT · EN · FR

Alvará

Class 3 · Category 1

4.8· 73 completed projects

Quote benchmarking

A detailed quote compared against regional medians.

Every project on remodel receives a detailed written quote from a personally matched, pre-vetted contractor. We compare that quote against our rolling median for that project type and region, so you can see whether the figure is competitive, average, or above market before committing.

Project typeRegionMedian quoteRange
Kitchen refitGreater Lisbon€17,500€8,000 – €48,000
Bathroom rebuildCascais / Sintra€16,800€12,000 – €24,000
Full renovationAlgarve€112,000€85,000 – €180,000

Benchmark data from Q2 2026 remodel project median. Ranges vary by specification and finish level.

How it works

From scope to staged payment. Four steps, no gaps.

01

Scope

Photos, dimensions, finishes. English form, English support.

02

Match and quote

We personally match you with a vetted local contractor who sends you a detailed, itemised quote, completely for free.

03

Independent inspection (optional)

On request, a condition report establishes the baseline before work begins.

04

Staged payment (optional)

On request, milestones are signed off by you and the inspector before each release.

Vetted contractors. A detailed quote. No surprises.

Submit your renovation scope and we will personally match you with a vetted and verified contractor, with a detailed quote benchmarked against regional medians.

Scope Your Project