Since May 29, 2026
Your property has a renovation obligation.
We make it simple.
The EU renovation passport now tells every Portuguese property owner exactly what energy upgrades their building needs. If your EPC rating is D or below, you're on the clock. We turn that document into a detailed quote from a vetted contractor, with optional independent inspection and staged payments you control from anywhere.
Sample property: Faro, Algarve
Passport Summary
Buyers who purchase F-rated properties without a renovation passport take on full legal and financial responsibility for compliance.
Which properties need a passport
Any residential property rated D, E, F or G needs a renovation passport. In Portugal this covers roughly 65 percent of the housing stock. The obligation was transposed into Portuguese law from 29 May 2026, and is triggered by a sale, a new rental contract, or the start of a major renovation.
The passport document itself typically costs 300 to 800 euros, issued by a certified SCE energy auditor. The renovation work it requires is separate, and substantially more expensive, than the passport document.
Cost by rating
What does your EPC rating actually cost?
The lower your current rating, the more stages your passport requires. This is based on a benchmark 100m² property in the Algarve; costs vary by region and property condition.
| Current rating | Stages required | Market cost range | Estimated duration |
|---|---|---|---|
| F | 4 sequential | €31K–48K | 8–14 weeks |
| E | 3 sequential | €22K–36K | 6–11 weeks |
| D | 2 sequential | €14K–24K | 4–8 weeks |
| C and above | No passport required | — | — |
All stages target an A rating post-renovation. Send us your EPC and we'll confirm your exact stage count and cost range.
From passport to project
Your passport says what. We handle how.
Upload your passport
Share your renovation passport or EPC. We translate each stage into a detailed scope document with material specs, trade requirements, and permit needs.
A detailed quote
We personally match you with a vetted and verified contractor who quotes against your scope. Quote in writing.
Independent inspection (optional)
On request, a qualified inspector produces a pre-renovation condition report. No work begins until the baseline is documented and agreed.
Staged payment (optional)
If you choose it, each passport stage becomes a milestone. Payment released only after the inspector signs off. You control the funds from anywhere.
Cost transparency
Passport estimates miss what things actually cost
Official renovation passports use standardised unit costs. They exclude scaffolding, site access, regional variation, heritage zone surcharges, and 23% VAT. Our quotes reflect actual market pricing from completed projects in your region.
| Item | Passport estimate | Market reality |
|---|---|---|
| Roof and envelope insulation | €8K–12K | €10K–14K |
| Window and door replacement | €6K–9K | €7K–12K |
| Heat pump installation | €7K–11K | €9K–13K |
| Solar PV and thermal | €5K–8K | €6K–9K |
Based on 47 completed projects, Algarve, Q1–Q2 2026.
Contractor acceptance rate
Three out of four contractors who apply don't pass our vetting, insurance check, and reference review.
Every licence verified at source
We vet and verify every contractor ourselves. Not self-reported. Verified.
Free matching for property owners
You never pay remodel for matching or your quote. Contractors pay a referral fee on completed projects. Our incentive is your project succeeding, not starting.
Your property vault
EPC expires in 9 years, 345 days
Coming soon
Every document your property needs, in one place
Your renovation passport, EPC, property records, inspection reports, contractor warranties, and payment receipts. Stored securely, accessible anywhere, with automatic reminders when certificates expire or new compliance deadlines approach.
Think of it as a secure folder for your Portuguese property. Every renovation through remodel adds to it automatically.
Join the waitlistFrequently asked questions
What is a renovation passport in Portugal?
A renovation passport is a document issued under the EU Energy Performance of Buildings Directive that sets out the staged energy upgrades a property needs to achieve an A or B energy rating. In Portugal, properties rated D or below are required to have a passport, which includes a costed plan for each renovation stage.
Do I have to renovate if my property is rated D or below?
The renovation passport sets out the upgrades your property needs to reach compliance, but timing depends on the trigger event, such as a sale, major renovation, or the deadlines set by the Portuguese transposition of the EU EPBD. We help you understand your specific obligation and the window you have to act.
How much does remodel cost?
Nothing for contractor matching. We charge contractors a referral fee only when a project is completed. There is no membership fee, no cost to be matched or to receive your quote, and no charge for the staged payment tools. Project management, if you choose it, is a separate fee agreed with you before work starts. If you choose an independent inspection, the inspector’s fee is confirmed with you before you book it.
How are contractors vetted for renovation passport work?
Every contractor is vetted and verified by remodel. We also review insurance certificates and past project references. Roughly one in four applicants passes our vetting process.
What happens if a contractor's work does not match the quote?
If you choose independent inspection, an inspector documents the condition of the property before work begins and signs off on each stage before payment is released. If work does not match scope, payment is withheld until it is resolved.
Can I manage the renovation if I do not live in Portugal?
Yes. Staged milestone payments, written quotes, and inspection reports are designed so you can approve and release funds remotely without needing to be on site in Portugal.
Read the full guide: what the EPBD means for your property →
Get your compliance quotes
Tell us your property's rating and location, we'll match you with vetted contractors.