Electrical rewiring · Last updated July 2026
Electrical rewiring in Portugal
Electrical rewiring in Portugal runs from €5,000 and typically takes 2 to 4 weeks. Older buildings often need a panel upgrade first, many still run a 6.9 kVA supply that cannot handle a modern induction hob, oven, and dishwasher running together. remodel matches you with a vetted and verified contractor working to RTIEBT standard, and checks the itemised quote against regional project data before you see it.

from €5,000 · 2–4 weeks
What's included
Panel upgrade
Consumer unit replaced and sized to the property, essential in older buildings still running a 6.9 kVA supply that cannot handle modern appliance loads.
Full circuit rewiring
Wiring replaced to RTIEBT standard across the property, with circuits separated correctly for kitchen, bathroom, and general use.
Lighting plan
Fixture points, switches, and dimming planned to the room, not just replaced one-for-one on the existing layout.
Quote benchmarking
Your itemised quote is checked against remodel regional project data before it reaches you, so panel and circuit costs are transparent.
Regional pricing
How location moves the price
| Area | Why | Vs. baseline |
|---|---|---|
| Cascais / Estoril | Coastal demand, highest foreign-owner density | +10 to 20% |
| Lisboa (central) | Older building stock, more panel upgrades needed | +10 to 20% |
| Sintra | Mixed heritage and suburban stock | Baseline to +10% |
| Porto / inland municipalities | Lower labour rates, easier site access | -10 to 15% |
What we verify
Every electrical contractor meets the same standard
Vetted and verified, Every contractor is vetted and verified by remodel before joining the network. Where the work legally requires a construction licence (alvará), we confirm it.
RTIEBT compliance, wiring work performed to the Portuguese technical regulations for low-voltage electrical installations.
Insurance in writing, proof of liability insurance requested before work starts.
English on request, English-speaking options are available on request, enough to discuss scope, materials, and changes without confusion.
Other categories
Planning more than one project
Questions about electrical rewiring
Planning electrical rewiring?
Tell us the property age and scope, and we'll match you with a vetted, English-speaking contractor for a competitive itemised quote.
Request a Quote