Outdoor & landscaping · Last updated July 2026
Outdoor & landscaping renovation in Portugal
Outdoor and landscaping renovation in Portugal runs from €15,000 and typically takes 6 to 12 weeks, weather permitting. That covers terraces, patios, pool area work, irrigation, and planting. remodel matches you with a vetted and verified contractor experienced in outdoor drainage and levelling, and checks the itemised quote against regional project data before you see it.

from €15,000 · 6–12 weeks
What's included
Terraces and patios
Stone, tile, or timber decking, levelled and drained correctly for the Portuguese climate, from a simple refresh to a full rebuild.
Pool area work
Pool surrounds, coping, and finishing, coordinated with any structural or waterproofing work the pool itself requires.
Irrigation and planting
Irrigation systems sized to the property and climate, plus planting and hardscaping that holds up to the local growing conditions.
Quote benchmarking
Your itemised quote is checked against remodel regional project data before it reaches you, so material and labour costs are transparent.
Regional pricing
How location moves the price
| Area | Why | Vs. baseline |
|---|---|---|
| Cascais / Estoril | Coastal demand, highest foreign-owner density | +10 to 20% |
| Algarve | Seasonal demand, concentration of villa and pool projects | +10 to 20% |
| Sintra | Mixed heritage and suburban stock | Baseline to +10% |
| Alentejo / inland municipalities | Lower labour rates, more available land | -10 to 15% |
What we verify
Every outdoor contractor meets the same standard
Vetted and verified, Every contractor is vetted and verified by remodel before joining the network. Where the work legally requires a construction licence (alvará), we confirm it.
Insurance in writing, proof of liability insurance requested before work starts.
English on request, English-speaking options are available on request, enough to discuss scope, materials, and changes without confusion.
Outdoor project history, prior terrace, patio, and pool area projects checked, since drainage and levelling mistakes are expensive to fix after the fact.
Other categories
Planning more than one project
Questions about outdoor renovation
Planning an outdoor renovation?
Tell us the space, rough dimensions, and whether a pool is involved, and we'll match you with a vetted, English-speaking contractor for a competitive itemised quote.
Request a Quote