Kitchen refit · Last updated July 2026
Kitchen refit in Portugal
A kitchen refit in Portugal runs €8,000 to €48,000 and typically takes 8 to 14 weeks, including 4 to 6 weeks of cabinet fabrication lead time. That covers cabinets, worktops, tiling, plumbing and electrical rerouting, and appliance integration. remodel matches you with a vetted and verified contractor in Cascais, Lisboa, or Sintra, and checks the itemised quote against regional project data before you see it.

€8,000–€48,000 · 8–14 weeks
What's included
Cabinets, worktops, and tiling
Stock or custom cabinetry, laminate through to stone worktops, and full splashback and floor tiling, itemised separately so you can see exactly where the budget goes.
Plumbing and electrical rerouting
Sink, hob, and appliance connections moved or reused as needed, wired and plumbed to current code, not just to what was already there.
Appliance integration
Built-in ovens, hobs, extraction, and refrigeration fitted and connected, whether you supply your own appliances or source through the contractor.
Quote benchmarking
Your itemised quote is checked against remodel regional project data before it reaches you, so you know if a line item sits above the median for your area.
Regional pricing
How location moves the price
| Area | Why | Vs. baseline |
|---|---|---|
| Cascais / Estoril | Coastal demand, highest foreign-owner density | +10 to 20% |
| Lisboa (central) | Heritage buildings, narrow access, higher labour rates | +15 to 25% |
| Sintra | Mixed heritage and suburban stock | Baseline to +10% |
| Porto / inland municipalities | Lower labour rates, easier site access | -10 to 15% |
What we verify
Every kitchen contractor meets the same standard
Vetted and verified, Every contractor is vetted and verified by remodel before joining the network. Where the work legally requires a construction licence (alvará), we confirm it.
Insurance in writing, proof of liability insurance requested before work starts.
English on request, English-speaking options are available on request, enough to discuss scope, materials, and changes without confusion.
Reference and project history, prior kitchen refit projects checked before a contractor is matched to yours.
Other categories
Planning more than one room
Questions about kitchen refits
Planning a kitchen refit?
Tell us the room, rough dimensions, and finish level, and we'll match you with a vetted, English-speaking contractor for a competitive itemised quote.
Request a Quote