Energy efficiency upgrades in Portugal: costs and grants in 2026

By Kellogg Fairbank · Co-founder of remodel · Last updated October 2026
Illustration of a sun, solar panels, a window and a heat pump
Energy upgrades in Portugal cost roughly €180 to €220 per m² for double-glazed windows, €4,000 to €5,000 for a 3 kWp solar system and about €4,600 to €10,500 for a heat pump in the Cascais area. The Vale Eficiência voucher scheme ended on 30 June 2026 and new vouchers were halted in February 2026, so most owners now pay upfront or use a bank credit line. Other support schemes may open later, so check the Fundo Ambiental before you buy. The common mistake is buying equipment before the building is insulated, which wastes the savings. remodel prices energy upgrades inside the same written quote as the rest of your renovation.
€180 to €220
per m² for double-glazed windows
€4,000 to €5,000
3 kWp solar system installed
30 Jun 2026
Vale Eficiência ended

What's in this guide

  • Double-glazed windows typically cost €180 to €220 per m², with a wider €120 to €300 range
  • A 3 kWp solar system costs about €4,000 to €5,000 and a 5 kWp system €6,000 to €7,500
  • Vale Eficiência ended on 30 June 2026, so budget as if no voucher is available
  • An ADENE energy certificate is required for renovations above 25% of the property value
  • Insulate and seal the building first, then size the heat pump and solar system

How much do energy upgrades cost in Portugal?


Typical 2026 prices are €180 to €220 per m² for double-glazed windows, €4,000 to €5,000 for 3 kWp of solar and €4,600 to €10,500 for a heat pump in the Cascais area.

These are indicative ranges from supplier quotes and our own regional benchmark, and your quote will depend on the building, access and the brand. Treat them as a sanity check when you compare three written quotes.

UpgradeTypical 2026 cost
Double-glazed windows€120 to €300 per m², commonly €180 to €220
Solar PV 3 kWp installed€4,000 to €5,000
Solar PV 5 kWp installed€6,000 to €7,500
Battery storageAbout €3,500 to €4,500 per 5 kWh
Heat pump (Cascais benchmark)€4,600 to €10,500
NoteVAT on solar equipment returned to 23% in July 2025 according to our research. Confirm the current rate on your invoice.

Which grants and subsidies are still available in 2026?


The Vale Eficiência voucher scheme ended on 30 June 2026, and new vouchers were halted from 23 February 2026, so owners should not plan around it.

A bank credit line for energy transition was announced in December 2025 under the Banco Português de Fomento (BPF), but we could not verify its current status. Banco de Portugal capped the TAEG on energy-transition credit at 8.9%.

Programmes change often. Check the Fundo Ambiental and the ADENE site before you sign a contract, and do not assume a subsidy applies retroactively to works already paid for.

WarningDo not rely on a contractor claiming you will get a grant. Ask which programme, which dates and which conditions, in writing.

What order should you do energy upgrades in?


Seal and insulate first, replace windows second, then size the heat pump and solar system to the reduced demand, because the earlier steps cut the size and cost of the later ones.

A well-insulated roof and walls lower the heating and cooling load, so a smaller heat pump may be enough. Replacing windows in a leaky building without addressing insulation often disappoints. Plan the sequence with your contractor before you order equipment.

Roof and façade works can also trigger permits. See the permit process guide before you finalise scope.

Get energy upgrades into your renovation quotes
remodel personally matches your project with a vetted and verified contractor with itemised windows, HVAC and solar lines, so each line is clear.
Discuss your project

Do you need an ADENE energy certificate?


Yes for sale, rent and for renovations above 25% of the property value. The ADENE certificate is valid for 10 years, and fees run from about €28 to €65 plus VAT.

The certificate is issued by a qualified expert registered with ADENE (the national energy agency). A before-and-after certificate also shows the benefit of your upgrades to a future buyer.

The EU renovation passport and EPBD rules are bringing more requirements. Our renovation passport guide covers what is coming.

How do you pay for energy upgrades?


Most owners now pay from savings or use bank credit, with the Banco de Portugal TAEG cap of 8.9% limiting the cost of energy-transition loans.

Compare the loan cost against the energy saving, not only against the purchase price. A heat pump replacing electric resistance heating usually pays back faster than windows. Ask each contractor for an itemised quote so you can phase the work.

Staged payments tied to inspected milestones protect you if the work slips. This is how remodel structures every project.

Frequently asked questions


Conclusion


Energy upgrades in Portugal pay off when they are sequenced well and priced transparently. The grant picture has changed, so plan on paying yourself and treat any subsidy as a bonus.

Ask for itemised quotes, confirm any grant in writing and keep the ADENE certificate for the sale.

Planning energy upgrades in Portugal?
Request a written quote with itemised energy lines, inspected milestones and staged payments.
Discuss your project
Kellogg Fairbank
Kellogg Fairbank
Co-founder, Remodel · Cascais, Portugal

Kellogg is a former payments executive turned entrepreneur, with a family background in real estate. He has spent the past year bringing that experience to the Portuguese property market, and co-founded remodel to apply the same rigor to how contractors are vetted.

Prices are indicative ranges and change by supplier and region. Grant programmes change frequently, so confirm the current rules with the official body before you commit. This is not financial advice.