HVAC & Air Conditioning · Portugal

Find a trusted HVAC contractor in Portugal

From a single split AC unit to a full heat pump system covering heating and cooling, HVAC work in Portugal ranges €800 to over €9,000 depending on scope. remodel matches you with an F-gas certified, vetted and verified contractor and checks the quote against regional project data before you see it.

Tell Us About Your Project

Renovating in Cascais? See Cascais-specific pricing and considerations → · Renovating in Lisbon? See Lisbon-specific pricing and considerations →

What an HVAC contractor covers

The scope of the trade

01

Split and multi-split air conditioning

Sizing and installing single or multi-zone AC systems, including running refrigerant lines and condensate drainage discreetly through existing walls.

02

Heat pump installation

Air-to-water or air-to-air heat pump systems covering both heating and cooling from one unit, sized against the property’s actual heat loss, not just its floor area.

03

Central heating and radiators

Boiler or heat pump-fed radiator systems, including underfloor heating loops when paired with a flooring renovation.

04

Ducting for larger properties

Concealed ducted systems for properties where visible wall units aren’t wanted, planned around ceiling depth and existing structure.

05

Servicing and maintenance

Annual servicing to keep a system running efficiently and to catch a refrigerant leak or filter issue before it becomes a full breakdown.

See how heating choices affect your renovation passport rating →

Typical costs

What HVAC work costs in Portugal

JobTypical cost
Single split AC unit, installed€800–€1,500
Multi-split AC, 3 zones€2,500–€4,500
Heat pump system (heating + cooling)€4,000–€9,000
Full central heating installation€6,000–€12,000
Annual service and maintenance€80–€150

Common mistakes

What goes wrong when hiring an HVAC contractor

Undersizing the system for the space

A unit sized purely on floor area, without accounting for insulation, glazing, and orientation, often struggles to keep up on the hottest or coldest days.

Skipping the electrical capacity check

Heat pumps and larger AC systems need a dedicated circuit. Confirming the property’s electrical panel can actually support the new load avoids a second, unplanned electrical job.

Hiring an installer without F-gas certification

Refrigerant handling is regulated EU-wide. An installer without current F-gas certification is a compliance and safety risk, not just a paperwork gap.

Installing heating before addressing insulation

A heat pump or radiator system sized for a poorly insulated space underperforms and costs more to run than the same system in a property where insulation was addressed first.

No maintenance plan after installation

A system without annual servicing loses efficiency gradually, often without an obvious sign until running costs are noticeably higher or the unit fails outright.

How we vet

Every HVAC contractor meets the same standard

✓

F-gas certification, confirmed before any contractor joins the network, required by EU regulation for anyone handling refrigerant.

✓

Vetted and verified, Every contractor is vetted and verified by remodel before joining the network. Where the work legally requires a construction licence (alvará), we confirm it.

✓

Insurance in writing, proof of liability insurance requested before work starts.

✓

English on request, English-speaking options are available on request, enough to discuss system sizing, placement, and running costs without confusion.

Questions about hiring an HVAC contractor

Need an HVAC contractor you can trust?

Tell us about your project and we'll match you with a trusted professional, F-gas certified, and ready to quote.

Tell Us About Your Project