Planning feasibility
The appointed architect assesses the applicable planning framework, existing approvals and constraints. A plot listing or an outline concept is a starting point for investigation, not confirmation of what can be built.
New builds / Cascais and Estoril
Bring the plot, the design and the construction together with a project manager coordinating the journey.
We assemble the architects, engineers, contractors and specialists your new home needs, with a clear brief, an agreed programme and regular updates. For owners who buy a plot, develop a design or already hold an approved project.
Cascais · Estoril · Birre · Alcabideche · Guincho

Plot assessment
The appointed architect assesses the applicable planning framework, existing approvals and constraints. A plot listing or an outline concept is a starting point for investigation, not confirmation of what can be built.
We coordinate the surveys and specialist assessments needed to understand boundaries, levels, ground conditions, access, drainage and utility connections.
Define the intended home, specification and overall investment. Consider design fees, investigations, construction, external works, connections and contingency alongside the land purchase.
Building in Cascais
The municipality runs from the Estoril seafront to the Atlantic coast, and the rules change plot by plot. These are the questions that usually decide a Cascais new build.
01 / Natural Park and coast
Plots around Guincho, Malveira and the cliffs can sit inside the Sintra-Cascais Natural Park or a coastal protection strip, where new buildings can be prohibited outright. Confirm the classification of the plot before you buy it.
02 / Gated estates
Many plots in Birre, Alcabideche and similar estates sit inside a gated community with its own architecture review in addition to câmara approval. Ask for the community rules and the approval timetable early.
03 / Applications
Applications go through the câmara's online portal, MyCascais. Owner and technician must be registered, and the site is drawn on the GeoCascais map. Your architect normally prepares and uploads the documents.
A house you can renovate is not always a plot you can build on. Our Cascais house guide sets out the Natural Park and coastal programme (POC-ACE) limits in more detail.
Process
Discuss the plot, your aims and the available documents. Identify the planning and technical investigations needed.
You receive: A defined assessment plan
Coordinate the architect and engineers around layout, specification, performance and budget priorities.
You receive: A coordinated brief and design decisions
The appointed professionals identify the submissions, consultations and conditions relevant to the site and the proposed home.
You receive: An identified route and programme assumptions
Compare construction proposals against the agreed information, clarify exclusions and define responsibilities, payment stages and change procedures.
You receive: A team, proposal and delivery plan to review
Monitor progress, coordinate actions and report on programme, decisions and proposed changes. Specialist and statutory responsibilities remain with the appointed professionals.
You receive: Regular reports, site photographs and action records
Coordinate snagging, commissioning information, outstanding actions and the documents identified by the appointed professionals for completion and use.
You receive: An agreed handover file and outstanding-items record
Planning
The planning route is established for your plot and your proposed design. The appointed architect checks the applicable municipal framework, any existing permissions and relevant coastal, heritage or protected-area constraints.
Investigations and consultations are built into the programme before construction dates are committed. We coordinate the information and actions required from the team. Approval outcomes and authority response times cannot be guaranteed.
Further reading / Permits
Our guide explains the distinction between exempt works and projects that need municipal control. Use it as background; the appointed architect confirms the route for your new home.
Read the permit guideDelivery
Coordinate design information, contractor mobilisation, procurement and specialist inputs. Flag dependencies and delays as they emerge.
Record assumptions and exclusions. Proposed changes are presented with their cost and programme implications for approval through the agreed process.
Agree site attendance, reporting frequency and review calls before appointment. Updates explain what has happened, what comes next and which decisions need you.
Appointment
Your proposal sets out the project management charges, inclusions, site attendance and reporting arrangements. Project management is a separate service, with its price agreed with you before any work starts.
Professional fees, investigations and construction costs are identified separately as the scope develops. Early budgets state their assumptions and uncertainties. Ground conditions, specification choices, utility requirements and planning conditions can change the eventual cost and programme. We do not publish a per m² new-build figure, because it depends too much on design, ground and specification.
Clear responsibilities
Architects, engineers, contractors and specialists hold the responsibilities assigned under their own appointments, licences and insurance. Contractors are vetted and verified, and proof of liability insurance is requested before work starts.
Project management does not replace technical certification or contractor obligations. The project agreements explain who you contract with, payment arrangements and warranties.
FAQ
Start a conversation
Share the essentials so we can assess the project and the support you need.
We review the location, scope, budget and timing, then get in touch to discuss suitability and any further information needed before a site assessment or proposal.
We will follow up personally, usually within 24 hours.