Full house renovation · Lisbon

Full house renovation in Lisbon

A full apartment renovation in Lisbon runs from around €85,000 and takes 16 to 30 weeks once permits are in place. Heritage zones such as Alfama, Baixa and Chiado start from around €100,000. remodel.pt matches you personally with one alvará-verified contractor who works in Lisbon, and the detailed quote is benchmarked against local medians before you see it.

Tell Us About Your Project

What a full house renovation covers

The scope of the work in Lisbon

01

Strip-out and structure

Demolition, structural repairs and any wall removals, with the engineering and the Câmara Municipal de Lisboa licence in place before work starts.

02

Electrics, plumbing and insulation

New wiring and a new distribution board, new supply and drainage runs, and insulation and window upgrades, all done while the walls are open.

03

Kitchen and bathrooms

Fitted and tiled as part of the same programme, so the trades finish in the right order rather than being booked one by one.

04

Floors, joinery and finishes

Flooring, doors, built-in joinery, plastering and painting, and the final snagging walk-through before handover.

05

One contractor accountable

A single alvará-verified contractor coordinates the trades, the schedule and the budget under one written contract.

06

Heritage zones and walk-up buildings

Alfama, Baixa and Chiado add façade and structure review, and buildings without a lift slow deliveries and waste removal. Both should be planned and priced in from the start.

Read the full house renovation cost guide →

Typical costs

What a full house renovation costs in Lisbon

A 100m² apartment in Lisbon typically lands between €85,000 and €140,000 depending on condition and finish level. Heritage zones sit at the higher end.

JobTypical cost
Partial renovation (1 to 2 rooms, minor structural)from €26,000
Full apartment renovationfrom €85,000
Full renovation, heritage zone (Alfama, Baixa, Chiado)from €100,000
Project management only (coordinating existing trades)10–15% of project cost

Typical timeline

How long a full house renovation takes in Lisbon

ScopeTypical duration
Full apartment renovation, once permits are in place16–30 weeks (4–6 months)
Permit processing, if structural work is involved60–120 days
Heritage zone (Alfama, Baixa, Chiado)Additional câmara review

Durations run from the start of work, after the quote is accepted. Permits and any heritage review run before that, and we plan for them up front.

How it works

One personal match, one detailed quote

There is no bidding round and no group of contractors chasing your enquiry. We read your brief, and we personally match you with the one vetted Lisbon contractor who fits your project.

01

Tell us about the project

A few minutes: where, what, rough budget and timing. Photos and plans help but are not required.

02

We match you personally

One alvará-verified, insured, English-speaking contractor who already works in Lisbon and has done this kind of job.

03

You get one detailed quote

Itemised and in writing, checked against Lisbon project data before it reaches you. Independent inspection and staged payment are available on request.

Planning a full house renovation in Lisbon?

Tell us about it and we will be in touch with your match.

Tell Us About Your Project

Common mistakes

What goes wrong with a full house renovation in Lisbon

Starting before the permit is in place

Work beyond the licensed project can lead to fines, stop orders and problems when you sell. Confirm what is licensed before demolition.

Choosing on the lowest price

A low figure on an unscoped full renovation comes back as extras. Compare scope line by line, not the total.

No contingency for hidden conditions

Older Lisbon properties reveal rot, damp and wiring surprises once opened. A sound quote includes a contingency and a clear rule for approving extras.

Paying too much upfront

Payments tied to completed stages protect you. Large advance deposits leave you with little leverage.

Verbal-only agreements

Scope, materials, milestones and price belong in a written contract signed before work begins.

Assuming a walk-up means easy access

No-lift buildings slow materials and waste removal considerably. This belongs in the timeline and the quote, not as a mid-project surprise.

How we vet

Every contractor meets the same standard

✓

Alvará de construção, valid construction licence of a class that covers the value of a full renovation, checked against the IMPIC registry before any contractor joins the network.

✓

Civil liability and works insurance, active policies confirmed, with coverage limits noted on file.

✓

Financial and tax standing, company checked for insolvency, registered debt, and tax and social security compliance.

✓

Working English, confirmed before joining, enough to discuss scope, materials, and changes without confusion.

Questions about a full house renovation in Lisbon

Planning a full house renovation in Lisbon?

Tell us about your project and we will match you personally with one alvará-verified contractor in the Lisbon area, who prepares a detailed written quote.

Tell Us About Your Project