Architects & Interior Designers

Find a trusted architect or interior designer in Portugal

An architect is legally required for anything needing a permit, structural changes, extensions, or facade work. An interior designer handles layout and finishes within existing walls. remodel.pt matches you with a verified professional for the right role, and checks the fee against local medians before you see it.

Tell Us About Your Project

What these roles cover

Architecture and interior design work

01

Permit-driven design and drawings

Preparing the technical drawings a câmara municipal requires for structural changes, extensions, or anything affecting a building’s exterior.

02

Structural assessment

Evaluating whether a wall can move, a floor can be opened, or a structure can support new elements before any layout decision is finalised.

03

Interior layout and space planning

Reworking how a space functions, kitchen and bathroom placement, storage, flow, within the existing or newly permitted footprint.

04

Materials, finishes, and fixture specification

Selecting flooring, tiling, fixtures, and finishes that suit the project’s budget and the property’s character.

05

Site coordination during construction

Checking that what gets built actually matches the drawings, catching discrepancies before they become expensive to fix.

Typical fees

What architects and interior designers charge

ServiceTypical fee
Permit-only drawings, straightforward scope€2,000–€4,500
Full architect service (design + permit + site)8–15% of build cost
Interior design, full apartment€70–€140/m²
Interior design, single room€1,200–€3,500

Common mistakes

What goes wrong hiring for design work

Assuming a renovation doesn’t need an architect

Anything touching a load-bearing wall, changing a building’s exterior, or extending floor area needs a câmara municipal permit, which needs an architect’s stamp regardless of how small the change feels.

Hiring an interior designer for permit-level work

An interior designer can’t submit câmara municipal drawings. If the project needs a permit, an architect needs to be involved from the start, not brought in after a design is already finalised.

Skipping the structural survey before finalising a layout

A layout that looks fine on paper can be ruled out entirely once a structural assessment reveals a load-bearing element in the wrong place. Survey first, design second.

Underestimating permit timelines

Câmara municipal review can take weeks to months depending on the municipality and scope. Build this into the project timeline from the outset, not as an afterthought.

Choosing based on portfolio alone

A beautiful portfolio doesn’t confirm licensing, insurance, or local permit experience. All three matter for a project to go smoothly.

How we vet

Every professional meets the same standard

✓

Ordem dos Arquitectos registration, checked for every architect before joining, confirming an active professional licence in good standing.

✓

Civil liability insurance, confirmed for architects and, where held, for interior designers, with coverage limits noted on file.

✓

Portfolio and reference checks, reviewed for interior designers before joining, since this role isn’t centrally licensed the way architecture is.

✓

Working English, confirmed before joining, enough to discuss design intent, drawings, and changes without confusion.

Questions about hiring an architect or designer

Need an architect or interior designer you can trust?

Tell us about your project and we'll match you with a verified professional for the right role, ready to quote.

Tell Us About Your Project