Planeta Hidratado

Planeta Hidratado

Member since 2026

Porto District

PT

Languages

Pending

Verified by remodel

About Planeta Hidratado

Planeta Hidratado is a renovation company serving Porto District in Portugal. The team specializes in earthworks & excavation, exterior paving & other exterior works, and demolitions.

We are based out of Porto and specialize in heavy groundworks and complete site preparation for residential, commercial, and industrial projects across the region.

What We Do:

Excavation: Foundation trenching, basement digging, utility trenches, and deep structural excavation.
Earthmoving: Site leveling, terrain grading, bulk soil relocation, and precision cut-and-fill operations.
Demolition: Controlled structural tear-downs, selective interior gutting, and reinforced concrete breaking.
Site Clearance: Rapid debris haul-away, licensed waste disposal, and turning raw plots into build-ready land.

Equipped with our own heavy machinery fleet and skilled operators, we manage your project's early-stage civil work safely, efficiently, and in full compliance with local municipal safety and environmental regulations.

Remodel Verified

Every contractor on remodel goes through the same checks before being listed.

Construction licence (alvará)

Checked against IMPIC records, pending for this contractor.

Liability insurance

Confirmed current, pending for this contractor.

How every remodel project works

  • Written, itemised quotes, no verbal-only pricing
  • Independent milestone inspection available on request

Services

  • ✓Earthworks & Excavation
  • ✓Exterior Paving & Other Exterior Works
  • ✓Demolitions

Featured Projects